# Interactive View: Add execution pause node to prevent full execution

**URL:** <https://forum.knime.com/t/interactive-view-add-execution-pause-node-to-prevent-full-execution/89401>\
**Category:** Feedback & Ideas\
**Tags:** feature-request\
**Created:** [August 1, 2025, 10:11am UTC](https://forum.knime.com/t/interactive-view-add-execution-pause-node-to-prevent-full-execution/89401 "2025-08-01T10:11:46Z")\
**Posts on this page:** 1\
**Showing post:** 2

<div class="post-metadata">

**Author:** ![mwiegand](https://forum-cdn.knime.com/user_avatar/forum.knime.com/mwiegand/32/66896_2.png) [@mwiegand](https://forum.knime.com/u/mwiegand)\
**Post date:** [October 21, 2025, 9:39pm UTC](https://forum.knime.com/t/interactive-view-add-execution-pause-node-to-prevent-full-execution/89401/2 "2025-10-21T21:39:42Z")

</div>

Just an FYI - Alongside this solution of mine:

> [@How to write big excel data with help of loop function?](https://forum.knime.com/t/how-to-write-big-excel-data-with-help-of-loop-function/90254/2):
>
> Hi @GD3F2UV, welcome to the Knime community. Thinking about this insteresting scenario I felt a generic and flexible solution would be best to provide. Also, thinking about some details liek file path separator, selcting a file etc., an interactive view would add a lot of comfort. That being said, et voilá: Here is the solution: I also thought about the ability to scan the Excel, select a sheet or even dynamically process an entire Excels contents but, looking at the clock, I opt…

> **[90254 - Split large Excel into smaller tables – mwiegand](https://hub.knime.com/mwiegand/spaces/Public/Knime%20Forum%20Support/90254%20-%20Split%20large%20Excel%20into%20smaller%20tables~t_r6ZeQ4aTX9ah4N/current-state)**
>
> Solutions for data science: find workflows, nodes and components, and collaborate in spaces.

I explored the options available:

1. Wait Node: Create a “wait file” using [Wait... – KNIME Community Hub](https://hub.knime.com/knime/extensions/org.knime.features.base/latest/org.knime.base.node.flowcontrol.sleep.SleepNodeFactory) and wait for its’ deletion  
Problem: Interactive View will nto open
2. Try-Catch with Breakpoint: Could work but is rather complex
3. Use a Sumit in combination with a swtich  
Works: It mitigates the issue with the wait node and is very simple to setup

 ![image](https://forum-cdn.knime.com/uploads/default/original/3X/c/8/c812152bbbf8e04c61e8cb213f19f89abeb4278a.png)

Java Code for the Java IF Table Switch  
`return $${Istart-processing-counter}$$.equals(0) ? 0 : 1;`

How it works?

- Upon first execution the counter for the submit is 0
- This causes the processing the get skipped
- Upon “Start” is pressed, processing begins

 ![image](https://forum-cdn.knime.com/uploads/default/original/3X/2/9/292f960223f026d6706ce025407d33b6f2f7812e.png)

This allows to preview without writing any data.

FYI @iCFO as I suppose you requested something in:

> [@Conditionally open interactive view / hold downstream execution](https://forum.knime.com/t/conditionally-open-interactive-view-hold-downstream-execution/72552):
>
> Has anyone found a way conditionally halt an “execute all” and open a component’s interactive view? I can conditionally stop downstream execution, but I would really like the workflow to auto open the interactive view where the necessary changes / corrections will be made.

---

_[View the full topic](https://forum.knime.com/t/interactive-view-add-execution-pause-node-to-prevent-full-execution/89401)._
