Line Plot with Date in the X Axis, not executing

Hi everyone, I am trying to pile some line plots with a date in the YYYY/MM/dd format in the X-Axis, but after the second iteration the workflow stops at the 40% progress.

I am attaching the workflow, Thanks cheers

Small Multiples.knwf (142.2 KB)

Hi @mauuuuu5

Works on my machine; 32 plots no problem :slight_smile: See the worklfow
Small Multiples All Green.knwf (198.9 KB).


gr. Hans

Hi Hans thank you, not in my case

image

image

I updated Knime and now is working, thank you

image

1 Like

This topic was automatically closed 7 days after the last reply. New replies are no longer allowed.