Hi,
in CUI there was the option to select the loop scope. That had, at least, two major advantages:
- Check for properly closed loop / loose ends / bad loop wiring
- Manage the workflow with greater ease
I’d to suggest to re-introduce this in MUI.
Best
Mike
