Prediction of cost based on the historical data

@singhsukh12 you will have to decide if this is a problem that indeed can be formulated as a regression task, this will depend on the relationship between your variables and he target.

A collection of regression algorithms can be found here

Otherwise this might be a time series problem if the costs are seasonal.

2 Likes